METHOD FOR PULLOUT TEST FOR PILES

Pile to be tested shall be chipped off and dressed to natural horizontal plane till sound concrete is met or till up to cut off level. Arrangement shall be made to fix the four dial gauges / LVDT set on periphery of the pile.

Reinforcement bars or special anchor bars shall be used for anchoring of girder with test pile as per design.

Supports shall be built as per design &requirement at both sides of test piles. The reaction to pull out will be generated from these supports (as per design), which shall be at least 3 D away from the test pile periphery, where D is the diameter of test pile.

Girder of sufficient length & section (as per design) shall be placed over test pile with center coinciding with center of test pile. Both ends of girder shall be temporarily supported to accommodate the hydraulic jacks & bearing plates kept over reaction supports.